Regularisation refers to the process of certifying building works that have been carried out without Building Regulations approval. The regularisation process enables people to submit a retrospective application relating to the previously unauthorised works.
Regularisation applications can be made for both domestic and non-domestic works which were started on or after 11 November 1985. Before this date, any work that has been completed is not covered by the procedure.
The local authority’s building control service should be consulted to discuss the particular circumstances of the works prior to a regularisation application being submitted.
Inspections may need to be carried out to determine whether or not the work complies with the building regulations, which may involve opening up the works, carrying out tests, sampling materials, and so on. The application form should be submitted along with a plan of the works done, the layout prior to the works being done, and, if required, plans or details of how to bring the works up to current standards.
When steps have been taken to ensure the building complies with current standards, or if no such work is required, then a regularisation certificate will be issued.
While applying for a regularisation certificate is not a legal requirement, complying with the building regulations is, and failure to comply may cause problems for the owner when they try and pass on ownership.
Manual to the Building Regulations, A code of practice for use in England, published by the Ministry of Housing, Communities and Local Government (MHCLG) in July 2020, states: ‘Regularisation certificates can be issued by local authorities retrospectively to indicate that work started after 11 November 1985 which has been completed complies with the Building Regulations which applied at the time the works were done.’
[edit] Related articles on Designing Buildings
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.